Images

 
  • Cable management duct thingy
  • Cable management rough in
  • One cable management side done
  • Racks all in order, need to bolt down
  • Racks all in order, need to bolt down
  • Battery rack bolted
  • Server rack bolted
  • Bolts used to fasten racks
  • Door installed on battery rack
  • Racks
  • Had to move fibre equipment, just makes it
  • Inside battery rack
  •  
  • this is going to get cleaned up eventually
  • Wall top and bottom plates done
  • framing in the server room nearly complete!
  • Going to add a door for the crawlspace
  • Like a glove... and I did not even plan to put the file cabinet there!
  • overkill concrete anchors
  • server rack
  • server rack
  • bad cable management, to be fixed
  • bad cable management, to be fixed
  • server rack
  • getting dusty
  • Wifi AP
  • Vapor barrier and wood added
  • Not yet sure what will go here, maybe some kind of control/display panel
  •  
  • Sub panel installed!
  • lighting installed
  • sub panel installed
  • [url=http://gal.redsquirrel.me/images/other/random/d7k_0777.jpg][img]http://gal.redsquirrel.me/thumbs/lrg-1999-d7k_0777.jpg[/img][/url]
  • brightest hot aisle ever seen
  • old plug finally retired
  • Panel
  • Two #10 cables run to server outlets (currently 15a but can go up to 30a)
  • Outlets in server rack
  • Cables inside rack
  • Installed outlet for FibreOP