Images

 
  • Ran outlets throughout server room (outside and inside)
  •  
  • oops...
  • Waiting for trim glue to dry, no nailing surface due to where it's at
  • fuses ready for batteries
  • Panel cover is on, and labeled
  • Labels!  A sign of near completion.
  • Cable management slats in place for the front
  • Door
  • Primer applied
  • Primer applied
  • Getting ready to install batteries - safety first!
  • Starting on DC electrical
  • battery switches and meter in place
  • DC cabling done
  • DC cabling
  • first battery bank online
  • Inverter battery switches in place
  • PDUs in place
  • Battery bank 1 in place
  • Fans in
  • Both battery banks online
  • Inverter in it's new permanent location
  • Both battery banks online
  • Started to do cable management
  • Started to do cable management
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  • cleaned up cables
  • cleaned up cables
  • PDUs
  • DIN rail for automation stuff
  • Inverter-charger